Campion Renewal Center
Statistics
Construction
Area: 6 Floors
Budget: $380K
Schedule
Construction start date: 2005
Scope
Program
Existing building to remain occupied during construction
Elevator to serve both passengers and service/delivery use
Design intent to minimize visual impact on building inside and out
Relocate accessible rest rooms
Materials
Machine: Otis Gen 2 Elevator (Belt Driven Traction Elevator)
Precast concrete façade
Terra Cotta brick walls
Concept
Locate elevator inside existing building to minimize the impact on historic character and to minimize cost.